Axias - Project List

1770 Crystal Drive.jpg

1770 Crystal Drive - Amazon Headquarters

Winner of CMAA 2021 - Project of the Year

285,000 SF, $55M

The repositioning of 1770 Crystal Drive including a full façade replacement and an interior renovation of select public spaces, lobbies, and building cores. A new public arcade and building lobby will be provided facing Crystal Drive as well as new retail spaces. A new entry connecting to an existing below grade mall will anchor the building at grade facing Crystal Drive. Two exterior roof terraces were added at the top two floors of the building. The building renovation is pursuing LEED-CS at a Silver certification level.

Acted as the Primary Construction Manager on behalf of Developer JBG Smith.

Hanscomb Consulting Office.jpg

Hanscomb Consulting Corporate Office

Office Tenant fit-out.

Acted as lead construction manger, and ownership lesion for ownership design decisions.

George+Mason+High+School.jpg

George Mason High School

Assisted with Preconstruction Services for this $100M+ design-build project.

Hilton+Crystal+City+Facade+Renovation.jpg

Hilton Crystal City Facade Renovation

$6M

Acted as primary Construction Manager on behalf of developer, JBG Smith.

7900 Wisconsin Avenue - Multifamily & Retail

Supported the lead CM with retail coordination of a large grocer and various other support on behalf of developer, JBG Smith.

JBG Smith Corporate Headquarters

Acted as primary Construction Manager for the demolition and abatement of the existing 12 story tower. Assisted with retail coordination.

Nicecream-DC.jpg

Nice Cream

Acted as lead Retail Project Coordinator on behalf of Landlord and Developer, JBG Smith to manage the fit out of a new Nice Cream location.

Roti Chevy Chase

Acted as lead Retail Project Coordinator on behalf of Landlord and Developer, JBG Smith to manage the fit out of a new Roti fast casual location.

The+Shop+Salon+Shaw+DC.jpg

The Shop Salon, Shaw DC

Acted as lead Retail Project Coordinator on behalf of Landlord and Developer, JBG Smith to manage the fit out of a new Shop Salon location.

Watergate West Lobby.png

Watergate West Lobby, 1st Floor and Roof Restoration and Renovation

Acted as primary Construction Manager. Work included scope writing, finalizing the RFP, the bidding process and overseeing work installation.